"As an avid cyclist myself, I have ridden Manufacturers Road down to Moccasin Bend hospital many, many times over the years," Darrin Ledford, Chattanooga's deputy chief of staff, said on Saturday, September 26. "And as we were standing on this beautiful new connector, watching the trucks go by, for the first time in my life, I felt like we finally had a safe path."
He was speaking at the opening of the Moccasin Bend Connector. It's a paved path of nearly 1.5 miles along Manufacturers and Hamm roads that links the North Shore with National Park Service trails in the Moccasin Bend National Archeological District. One week later, on October 3, the Walnut Street Bridge reopened after an 18-month restoration. Those two openings change where a North Shore walk can end. Renaissance Park used to be the far edge of the riverfront parks. Now it's where a protected path toward a national park unit begins.
The Road the Path Replaced
Until September, anyone heading from the North Shore to Moccasin Bend on foot or by bike used Manufacturers Road and Hamm Road with the vehicles that serve the area. The Times Free Press reported that the route "had an element of danger for users due to the tractor-trailer traffic along the way." The trucks haven't gone anywhere. The difference is that walkers and riders now have their own lane beside them.
The idea is much older than the pavement. Greg Herold, an engineering manager in the city's public works department, said the greenway traces back to planning in the 1980s. Serious work didn't start until 2015, and design and construction together cost $4.2 million.
The construction schedule also explains why parts of the path may already look familiar. In January 2025 the city said contractors had started on the Manufacturers Road / Hamm Road Gateway Project, with an estimated completion date of November 26, 2025. On November 13, 2025, the city reported that major construction was complete, including the sidewalk, new asphalt and striping, and that Hamm Road was back to two-way traffic. The official ribbon cutting, called the Moccasin Bend Roll & Stroll, came about ten months after that.
The Route, Start to Finish
Jim Johnson is a North Shore resident and longtime trails advocate. He described the connector this way: "This is barely a mile and a half, but it plugs into so many other stretches of trail." Here's the sequence those stretches now make, starting downtown:
- Walnut Street Bridge. The city says the bridge's north bank leads directly into Coolidge Park, Renaissance Park and the North Shore district.
- Coolidge Park. It has a walking path and access to the Tennessee Riverwalk, and Renaissance Park sits right next door.
- Renaissance Park, 100 Manufacturers Road. The park lists trails and a walking path. Outdoor Chattanooga says the new trail runs "straight into Renaissance Park" and describes the route as short, flat and highly accessible.
- The connector. The city's project scope runs from US-27 at Manufacturers Road to the Hamm Road intersection, then down Hamm Road to Moccasin Bend Road.
- The Hamm Road field. The National Park Service manages an open field just off the greenway on Hamm Road. It hosted the ribbon cutting and is planned as the district's main arrival point.
Opening day ran the same route in reverse. After the ribbon cutting on Hamm Road, Outdoor Chattanooga led a group ride and walk back to Renaissance Park.
If you don't own a bike, Bike Chattanooga has bike-share stations at 200 River St., where Outdoor Chattanooga is based, and at 301 Manufacturers Road. There's also a station at Renaissance Park. For food before or after, Sully's Crepe Co. soft-opened near Coolidge Park at 163 River St. in July. Its website lists hours of Thursday through Sunday, 9 a.m. to 4 p.m., with crepes and handcrafted coffee.
What Is Waiting at the Far End
The connector ends at Moccasin Bend Road. The reason to go that far is the peninsula. It became a federally recognized national archeological district in the early 2000s and is part of the Chickamauga and Chattanooga National Military Park. The National Park Service lists two developed trails in the district. The new greenway was built to connect to both.
| Blue Blazes Trail | Brown's Ferry Federal Road | |
|---|---|---|
| Length | Two-mile loop | 1.2 miles round trip |
| Terrain | Forest and swamp near the south end of the peninsula, along levees and ancient shorelines | Historic trace, foot traffic only |
| Highlight | Tennessee River overlook | Historic road trace |
| Trailhead per NPS | On the right, 0.9 mile after turning onto Moccasin Bend Road | Parking on the left, 2.6 miles along Moccasin Bend Road near Riverside Avenue |
| Bikes | Not addressed on the NPS page | Not allowed; NPS directs bikes to paved roads |
Leashed pets are welcome in the park, and the Brown's Ferry page names leashed pets specifically. Hours depend on daylight. The Brown's Ferry page lists 6 a.m. to sunset. The park-wide policy closes units from half an hour after sunset until half an hour before sunrise. Both trail pages were last updated in 2015, so check current conditions before a long outing. As days shorten through October, an afternoon start from the Walnut Street Bridge leaves less time on the peninsula than it did in summer.
The Stretch Still Missing
The new path ends at Moccasin Bend Road. The trail distances in the table are measured along that road, starting from where the connector ends. City and NPS material describes the greenway's endpoint and the trailheads. None of it describes a protected path for the 0.9 mile to Blue Blazes or the longer trip to Brown's Ferry. Walkers and riders should plan that last stretch for themselves until the park service says otherwise.
That gap lines up with the next project. Brad Bennett, superintendent of the Chickamauga and Chattanooga National Military Park, said the Hamm Road field will be where the public arrives "by foot, by bicycle, by car, by school bus, by motor coach to be oriented to why this place is important." Ground is expected to break on the first phase in 2027. That phase includes off-street parking, restrooms, a bioswale to filter runoff, and a path to the Tennessee River. Over time, Bennett said, the field will become the center of interpretation and education for the district, the "front door of Moccasin Bend."
The peninsula's other long-standing use is changing too. In the same week the connector opened, state and local officials named a new site for the Moccasin Bend Mental Health Institute on Birmingham Highway in Lookout Valley. It will replace the aging facility at the tip of the peninsula. That's the same hospital Ledford used to ride past on Manufacturers Road.
Making the Most of It This Fall
The route already works for a weekend outing, with the limits described above:
- Short version. Walk or ride from Coolidge Park through Renaissance Park and out the connector to the Hamm Road field, then back. Everything on this route is paved, and it's described as flat.
- Long version. Add the Walnut Street Bridge from downtown at the start, then continue on Moccasin Bend Road toward the Blue Blazes trailhead. Treat that last stretch as a road segment, not greenway.
- With a dog. Leashed pets are welcome on park land, so the whole trip works for a dog that can handle the distance.
- With a bike headed for Brown's Ferry. Bring a lock. The trace is foot traffic only.
- Timing. Aim to reach the NPS trails well before sunset, since the park closes at dark.
Mayor Tim Kelly called the restored Walnut Street Bridge "our Eiffel Tower" when it reopened. The connector got less attention, but it's what now carries the bridge's foot traffic past Renaissance Park, along Manufacturers and Hamm roads, to a field the National Park Service plans to make the front door of Moccasin Bend.
If you're on the North Shore and this route has you thinking about how close you'd want to live to a trail like it, or how trail access compares across the Georgia-Tennessee line, Wesley Talley is glad to talk through what's within walking or riding distance of the places you're considering. Let's Connect.